top of page

Terrace Addition & Home Improvements

The project includes adding terraces spaces for outdoor activities. As part of the project we designed a Master Plan to divided the construction in 3 phases. Phase 1: back terrace; phase 2: pool deck and outdoor kitchen; phase 3: side terrace. The project is on the bid process for construction of phase 1. Carcongroup Eng. is responsible for the design and the construction supervision of the project.

Master Plan

all contents © Carcongroup Engineering P.S.C.

  • Twitter - White Circle
  • Instagram - White Circle
  • Facebook - White Circle
  • LinkedIn - White Circle
bottom of page